Commissioning
Commissioning is a systematic process in which it is established, through verification and documentation, that all facilities and installations function properly. This involves examining the interrelationship of the systems and whether they operate in accordance with the principles of the documented design. It is also checked whether the installations meet the needs of the owner and user. This process starts with the Program of Requirements and ends at least one year after the commissioning of the facility or installation.
Maximuse offers guidance during the commissioning process. The goal of this process is to reduce risks that could have consequences for the user. To achieve this, a structured process must be followed. Maximuse applies the V-model shown below for this process. We apply the system in such a way that each step forms a complete whole.
A Analysis TO Technical Design
1 Design Phase ED Execution-Ready Design
2 Execution FAT Factory Acceptance Test
3 Verification Phase SAT Site Acceptance Test
4 Management Phase SIT Site Integration Test
PoR Program of Requirements IV Installation Verification
SO Sketch Design FV Functional Verification
PD Preliminary Design PV Performance Verification
FD Final Design
This means that the commissioning process can also be started at other times or that certain steps can be skipped. If work has already started or certain design steps within a project are being skipped, this can be extracted from the V-model.
Formulating requirements and wishes
We support the entire commissioning process and guide testing and measurements to achieve a complete whole. We do this together with (project) partners and have extensive experience with commissioning in healthcare environments. We are involved in various controlled environments within healthcare, such as operating room complexes, CSSD, Radiology departments, BSL laboratories, pharmacies, etc.
We draw up a commissioning plan at the start of every project. The commissioning plan describes when, who, what, where, and how verification must be performed. The required quality, functionality, and performance are described in the design per discipline, system, installation, etc. These documents are part of the contract and constitute the contractor's obligations.
During the analysis phase, we define the project and formulate requirements and wishes with the user(s). The result of this step is a Statement of Requirements (SoR) in which all requirements are listed and which serves as the starting point for the design. The design consists of various steps in which the design is developed in increasingly greater detail into a buildable whole. After each step, we draw up a phase document stating whether it complies with the SoR and/or whether there are deviations compared to the previous phase.
After the design is complete, the entire system is executed, and we start the testing. Testing is necessary to determine whether something meets the stated requirements. After each test, a report must be submitted containing the results and deviations from the requirements as set out in the final phase document of the design phase.
Curious how we can help you? Would you like more information about OR solutions or do you have another question? Please feel free to contact us.